phone

Apartment Renovation in Dubai

Planned around your building, not just your floor plan.

Renovating an apartment in Dubai means working inside two sets of rules, yours and the building’s. Structural walls stay where they are, the drainage stack decides where a kitchen or bathroom can go, and the fit-out NOC decides when you can start. We establish all of that before we design anything, then handle the approvals, the lift bookings and the access so the work runs without friction with management.

Survey Before Quote In-House Joinery 10-Year Warranty
Apartment renovation in Dubai with a modern kitchen and living area under construction

What we offer

Full apartment renovation services across Dubai

In an apartment, the structure is shared. Columns and shear walls cannot move, wet areas are usually fixed by the drainage stack below, and anything touching the facade or the building’s services is out of your control regardless of what you own inside.

We establish those boundaries during the survey, before any design work begins. It is the difference between a plan that gets approved and one that gets rejected after you have already fallen in love with it.

The practical side matters just as much: service lift bookings, permitted working hours, protecting common corridors, and removing waste without leaving dust through the lobby. Getting this right is what keeps building management on your side for the length of the project.

Building Rules Assessed

We confirm what your building permits before design begins

Survey Before Quote

We assess what the building allows before pricing the work.



Our Own Joinery

Kitchens, wardrobes and doors made in-house, not bought in.


10-Year Warranty

Our joinery and installations are backed for ten years.


How we work with you

Our apartment renovation process

A clear path from the first site visit to a finished apartment and a clean handover.

1

Site Visit

We check the layout, the structure and what the building permits.


2

Design & Scope

Drawings plus a written scope of what is and is not included.


3

Building Approvals

We prepare submissions and arrange lift and access bookings.

4

Strip Out & Build

Protected access, controlled dust, waste removed as we go.


5

Joinery & Finishes

Our joinery installed, then finishes, fittings and making good.

6

Snagging & Handover

We walk the apartment with you and close out every item.


Our Work

Apartments we have renovated across Dubai

Modern kitchen with marble countertop and sleek design.

Centro, The Villa

View project
Kitchen with a black marble countertop and bar chairs

Dubai Marina

View project
kitchen design featuring multiple storage units

Jumeirah Park

View project
Apartment renovation in Dubai with a spacious living area
Apartment renovation in Dubai with a bright living room

Why choose us ?

We know what buildings will and will not allow

Structural walls, drainage positions and facade elements are usually fixed. We identify those limits at survey stage and design within them, rather than producing a plan that building management later rejects.

We work considerately in occupied buildings

Common corridors and lifts are protected, dust is controlled at source, and waste is removed rather than stacked in shared areas. Neighbours still live there while the work is happening, and how the site is run affects how the building treats the project.

Design and joinery under one roof

Kitchens, wardrobes, doors and fitted furniture are made by us rather than subcontracted, which matters more in an apartment where every millimetre of storage counts and units have to work around fixed services.

Written scope before work starts

You receive a document setting out what is included, what is excluded and what would count as an addition. It is the simplest protection against a renovation drifting in cost and time.

Offering an array of services in the fields of architecture & interior design.

 

Testimonials

Let’s see what our clients have to say about their experience working with Pine Tree Lane.

Arabian Ranches – Lizzie Al Mahra

Ghadeer The Lakes – Ruchi Sharma

Jumeirah Lake Tower – Fathima Smith

Jumeirah Village Triangle – Christine Travis

Palm Jumeirah – Arwa Presswala

South Ridge Downtown – Puja Gujral

FAQs

In most cases yes. Buildings typically require a fit-out NOC before work begins, along with contractor details, insurance and often a refundable deposit. Requirements differ from building to building, so we confirm exactly what yours needs during the survey and prepare the submissions.

Internal partitions can often be altered, subject to approval. Structural columns, shear walls, facade elements and the building's main services generally cannot. Moving a kitchen or bathroom is limited by the drainage stack. We confirm what is possible before any design work starts.

Cost depends on the size of the apartment, how much is changing, whether services are being reworked and the finishes chosen. Rather than quote a range that may not apply, we survey the property and price the actual scope. Our free Interior Cost Estimate is a useful starting point.

Sometimes, with written landlord permission and building approval. Tenants are usually limited to non-structural changes, and there may be a requirement to reinstate at the end of the lease. We can advise on what is realistic once we know the terms.

Ready to start your apartment renovation?

Tell us about your apartment and we will visit, check what the building allows and scope the work properly. Get a free estimate online, or talk to our team today.

whatsapp-icon