Get a free estimate online, or talk to our team today.
At Pine Tree Lane, every project follows a proven process designed to deliver excellence at every stage. Here is what to expect, and how long each stage takes.
Every kitchen is backed for ten years.
Any manufacturing defect is put right, free.
Space-optimised designs that keep everything organised.
Every kitchen is customised to your needs.
The production and installation timeline below is an approximate guide to your project’s duration. Please note that timelines may be influenced by factors such as material availability, third-party trade scheduling and site access.
For larger projects, works may be delivered in stages (for example, kitchen and wardrobes as one stage, doors and joinery as another).
Please note:
Last updated: (July 2026)
Disclaimer: This timeline is indicative and may be affected by the material approvals, availability, site readiness, coordination, or any design changes or any additional works.
This refers to the period between the submission of final construction plans and the
point at which the project is ready for production.
*Timeframes for veneer and solid timber projects depend on material type and availability.
The following times start after a standard installation is completed.
Get a free estimate online, or talk to our team today.